Friday, July 18, 2008

Entertainment Center 9

7:58 PM Comments 0

The Before Shot

img 0712 400x300 Entertainment Center 9

The After Shot

img 1021 400x300 Entertainment Center 9

All of the remaining details were finished on Thursday.  The remaining door was mounted, the hardware was attached, the half walls on either side of the upper fireplace stonework were installed, as were the two upper horizontal trim pieces and the far right vertical column, and the fabric frames were installed in the upper door frames.

img 1025 400x300 Entertainment Center 9

A close-up shot of the stonework, mantle, and the fabric paneled frames.

img 1029 400x300 Entertainment Center 9

A shot of the lower portion of the entertainment center.

img 1038 400x300 Entertainment Center 9

A parting shot of the mantle and the stonework.

Leave a Reply