Archive for November, 2008

J. Alexander Hacked!

Wednesday, November 26th, 2008

This is Jared’s wife Mandi. I’m hijacking his blog in order to embarass him. Since I know all his usual passwords the hacking wasn’t all that hard… So a few weeks ago I saw a contest for the “Art of Manliness/Old Spice Man of the Year”. Of course Jared is amazing, incredible and very manly [...]

Ranney Kitchen 7

Friday, November 21st, 2008

In order for the granite company to guarantee the counter tops by Thanksgiving, the base cabinets had to be installed by Monday, November 10th.  So, here are my brother and I are on Monday afternoon installing the four base cabinets. The base cabinets went in on leveling feet in the front and a 4″ cleat [...]

Ranney Kitchen 6

Friday, November 21st, 2008

The much anticipated day to demo the existing kitchens cabinetry, counters, and back splash finally arrived.  I was being paid to do what we dream of doing as kids…tear stuff apart!  Granted, I couldn’t just go in swinging with a sledge hammer, but it was close enough to be lots of fun. Here is what [...]

At The Shop (10/31 & 11/7)

Friday, November 14th, 2008

Our first combined “At the Shop” entry is due to the fact that we are so busy I feel like pulling my hair out at times!  We have two dining tables, a kitchen, 115′ of bookshelves, a wine rack, and old wooden English phone booth refinishing job in the works!  All for a shop that [...]

Ranney Kitchen 5

Thursday, November 6th, 2008

A shot looking down on the cabinet that holds the lazy susan and the cabinet to the left that holds four drawers and a spice pull-out.  The cabinet that holds the lazy susan has the corners angled with melamine to prevent spillage of items from the lazy susan into the deep, dark recesses of the [...]

Ranney Kitchen 4

Tuesday, November 4th, 2008

The finishing process for these cabinets is a little different than a usual stained finish.  Instead of using a stain on the face frames and door panels, we are using a stain glaze to achieve the look the clients desire.  Also, rather than staining the bare wood before spraying on two or three coats of [...]

Ranney Kitchen 3

Tuesday, November 4th, 2008

While I was waiting for the clients to choose a sink, which was necessary before the final four cabinet boxes could be built, I began milling up some Alder for all the face frames.  Each of the boxes required four pieces to build the face frame, all 7/8″ thick, with a shallow dado cut into [...]